Bald Head Island dredging pushed back - WSFX - FOX Wilmington, NC

Bald Head Island dredging pushed back

Posted: Updated:

BALD HEAD ISLAND, NC (WECT) - Dredging in Bald Head Island will start a little later than expected.

Village officials say the dredge arrived, but a pipe still needs to be shipped.


That, in turn, will set back the start date.

The Army Corps of Engineers was expected to start pumping sand next week, but that will now be pushed back to Feb. 1.

Copyright 2013 WECT. All rights reserved.

Powered by WorldNow
All content © Copyright 2000 - 2014 WorldNow and WSFX. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.
FCC Public File
Email: publicfile@wsfx.com
Phone: (910) 791-8070
EEO Report
Closed Captioning